Anti-theft markings help deter the theft of your vehicle, and permanent, traceable ID codes help enable its recovery.
Premium Window Tint
Price:
$11/mo*
Total: $699
Lojack
Price:
$14/mo*
Total: $895
3. Value Your Trade
Blue Book® Trade-In Value
The Kelley Blue Book® Trade-in Value is Kelley Blue Book's estimate of what a consumer can expect to receive from a dealer for a trade-in vehicle assuming an accurate appraisal of condition. This value will likely be less than the Kelley Blue Book® Private Party Value because the reselling dealer incurs the cost of safety inspections, reconditioning and other costs of doing business.
We're sorry, but KBB doesn't have a trade value for this vehicle and configuration.
Executive Package - Includes BMW Iconic Glow kidney grille, power rear sunshade and manual rear side window shades, Parking Assistant Plus, parking view with 3D view, interior camera, front ventilated seats, and front and rear heated seats.
Heated Front and Rear Seats -
Carbon Package - Includes M Carbon roof, rear spoiler and exterior mirror caps.
Carbon Fiber Silver Thread High Gloss Interior Trim w/Dark Silver Accent -
M Drive Professional - Includes M Drift Analyzer and M Laptimer.
Driving Assistance Professional Package - Includes Driving Assistant Professional, traffic jam assistant, lane change assistant, and partial automated driving (includes hands-free driving up to 40 mph on selected highways).
M Compound Brakes w/Red Calipers -
Front Ventilated Seats -
BMW Iconic Glow Kidney Grille -
20/21 in. M Dual-Spoke Jet Black 951M Wheels - Includes 20.0 in. x 10.5 in. front and 21.0 in. x 11.0 in. rear alloy wheels with 285/40R20 front and 295/35R21 rear staggered high performance tires.
entertainment
Auxiliary audio input: Bluetooth
Auxiliary audio input: iPod/iPhone
Auxiliary audio input: USB
Connected in-car apps: Amazon Alexa
Connected in-car apps: Google POIs
Connected in-car apps: Google search
Digital sound processing:
Infotainment screen size: 14.9 in.
Internet radio app: Spotify
Premium brand: Bowers & Wilkins
Radio data system:
Radio: AM/FM
Radio: HD radio
Radio: touch screen display
Radio: voice operated
Satellite radio: SiriusXM
Smartphone integration: wireless Android Auto
Smartphone integration: wireless Apple CarPlay
Speed sensitive volume control:
Subwoofer: 1
Surround sound:
Total speakers: 17
Watts: 655
performance and engineering
Hill holder control:
Stability control:
Suspension: Active suspension:
Suspension: Driver adjustable suspension: ride control
Suspension: Front shock type: twin-tube gas
Suspension: Front spring type: coil
Suspension: Front stabilizer bar:
Suspension: Front struts:
Suspension: Front suspension classification: independent
Suspension: Front suspension type: double wishbone